Quercus coccinea
Scarlet Oak

About the plant
What it is and where it grows — not part of any germination protocol.
Safety
- Toxicity
- Poisonous to horse, cattle. Acorns, young leaves. Gallotannins, quercitrin, and quercitin. Stated for Quercus spp.Plants Poisonous to Livestock
- Toxicity
- Low severity. Leaves, Seeds. Gallotannins, quercitrin, and quercitin.Extension Gardener Plant Toolbox
The plant
- Habit
- TreePlant Finder
- Habit
- treePlants of the World Online
- Height
- 50-70 ft15-21 mPlant Finder
- Spread
- 40-50 ft12-15 mPlant Finder
- Flower
- Yellowish-greenPlant Finder
- Blooms
- April to MayPlant Finder
- Native range
- Eastern United States, southern CanadaPlant Finder
- Hardiness zones
- 4-9Plant Finder
- Note
- Only the half of the acorns that sank were viable. Float them before sowing.Seed Germination Theory and Practice, 2nd ed.
Growing conditions
- Sun
- Full sunPlant Finder
- Soil
- Average, dry to medium, well-drainedPlant Finder
- Soil pH
- Acid (<6.0)Extension Gardener Plant Toolbox
- Moisture
- Dry to mediumPlant Finder
- Watering
- Dry to mediumPlant Finder
Toxicity is noted only where a source states it. No note here is not a finding of safety.
Sources: Plant Finder — Missouri Botanical Garden; Plants of the World Online — Royal Botanic Gardens, Kew; Extension Gardener Plant Toolbox — NC State Extension; Plants Poisonous to Livestock — Cornell University Department of Animal Science; Seed Germination Theory and Practice, 2nd ed. — N. C. Deno.
Worth knowing
- Best known for its brilliant autumn color: the leaves turn a rich scarlet red. It occasionally reaches 150 feet. Lady Bird Johnson Wildflower Center: Quercus coccinea
This source reports two treatments. Both are shown.
Protocol 1
DerivedN. C. Deno, 1993Difficulty Low
Start around December 23, 2026 for a May 3 last frost.
Cold moist stratification
Duration: 90 daysTemperature: 40°F 4°C
Deno gives no length for this period; three months is his standard cycle.
Warm moist stratification
Temperature: 70°F 21°C
First up on the fourth day, then about 7% of the packet a day.
about 3 months from start to step 2. Germination happens during step 2, in 13 days.
61% germination — first up on day 4, then 7% a day.
Float the acorns first: only the half that sank were alive at all.
Protocol 2
DerivedN. C. Deno, 1993Difficulty Moderate
Start around September 24, 2027 for a May 3 last frost. Too late for spring 2027 — that needed starting on September 23, 2026.
Warm moist stratification
Duration: 90 daysTemperature: 70°F 21°C
8% here. Deno gives no length for this period; three months is his standard cycle.
Cold moist stratification
Duration: 90 daysTemperature: 40°F 4°C
Warm moist stratification
Temperature: 70°F 21°C
28% in the second week.
about 6 months from start to step 3. Germination happens during step 3, in 14 days.
28% germination in 14 days.
8% comes up warm, 28% after the cold. Starting cold does better and is quicker.
How each step is done, in Deno’s words, and what Verified and Derived mean.
Germination trials
Readers’ own records of sowing this species, published after review. Share your trial · All trials
No trials shared for this species yet.